(Creston) A project to replace a bridge on U.S. 169 over the middle fork of the Grand River 5.3 miles south of Iowa 2 requires closing the roadway to traffic beginning at 7 a.m. Monday, April 5, until Thursday, July 29, weather permitting.
The Iowa Department of Transportation’s Creston construction office says during this project, traffic will be detoured around the work zone with a marked detour route using Ringgold County roads J-55, P-46, and Iowa 2. Permitted oversize loads will be prohibited on this detour route.
The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.