(Atlantic) The Atlantic School Foundation is funding a Greenhouse project at the High School. Atlantic Schools Superintendent Steve Barber says the structure is 48’ x 60’ behind the Ag Department.
Atlantic Schools Superintendent Steve Barber says the construction trades students are building the project with the help of Snyder Engineering for the site work, Stamp Construction doing the tiling work, PCS helping the concrete work, and Camblin Mechanical and Berg Electric.
Barber says the Greenhouse is for the use of many different people such as; the Horticulture Class, Special Education students, and the foods program.
Atlantic Schools Superintendent Steve Barber.