(Elliott) A road construction project west of Elliott on the Iowa 48 bridge over the East Nishnabotna River requires restricting traffic to one lane with temporary traffic control lights and a 10-foot lane-width restriction beginning at 7 a.m. Monday, March. 22 until Thursday, June 3, weather permitting.
The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.